如需变更维修方案,须经设计部门批准。
A.If the repair scheme must be changed, the approval of the design authority is hardy got. B.If the design authority need change the repair scheme, it can get the approval. C.If it is necessary to change the repair scheme, get the approval of the design authority.正确答案C