QUESTION 35
You are planning to update your running switch environment. You must know that certain conditions exist before the FASTPATH software and the RCF on a NetApp CN1610 cluster switch can be installed.
Which condition must exist in this scenario?
A.All ISL ports must be moved to a different switch. B.You can only update your switch environment within offline windows. C.You must set the port configuration to default for all ports before running the portcfgdefault port-number command. D.All cluster logical interfaces (LIFs) must be up and must not have been migrated.正确答案D