QUESTION 3
You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a custom

欢迎免费使用小程序搜题/刷题/查看解析,提升学历,成考自考报名,论文代写、论文查重请加客服微信skr-web

QUESTION 3
You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site. Referring to the exhibit, which steps are required to get an HA cabled system?

A.1 Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 4.
2 Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 4.
3 Cable the out-of-band ACP. B.1 Insert a cable from right controller port 0a to IOMA port 1, and from port 0b to IOMB port 3.
2 Insert a cable from left controller port 0a to IOMB port 1, and from port 0b to IOMA port 3. C.1 Insert a cable from right controller port 0a to IOMB port 1, and from port 0b to IOMA port 4.
2 Insert a cable from left controller port 0a to IOMA port 1, and from port 0b to IOMB port 4.
3 Cable the out-of-band ACP. D.1 Insert a cable from right controller port 0a to IOMB port 2, and from port 0b to IOMA port 3.
2 Insert a cable from left controller port 0a to IOMA port 2, and from port 0b to IOMB port 3.
正确答案C
访客
邮箱
网址

通用的占位符缩略图

人工智能机器人,扫码免费帮你完成工作


  • 自动写文案
  • 自动写小说
  • 马上扫码让Ai帮你完成工作
通用的占位符缩略图

人工智能机器人,扫码免费帮你完成工作

  • 自动写论文
  • 自动写软件
  • 我不是人,但是我比人更聪明,我是强大的Ai
Top