The loading of the ship must be done in accordance with __________.(1.0)
A.the ship's instructions B.the terminal’s instructions C.the port captain’s instructions D.the charterer’s instructions正确答案A
The loading of the ship must be done in accordance with __________.(1.0)
A.the ship's instructions B.the terminal’s instructions C.the port captain’s instructions D.the charterer’s instructions正确答案A