CAT I precision approach if the TDZ area RVR report is not possible, the MID RVR report can replace the TDZ area RVR report
A.Yes B.No正确答案A
CAT I precision approach if the TDZ area RVR report is not possible, the MID RVR report can replace the TDZ area RVR report
A.Yes B.No正确答案A