Refer to the exhibit.
An engineer built a new L2 LACP EtherChannel between SW1 and SW2 and executed these show commands to verify the work.
Which additional task allows the two switches to establish an LACP port channel?
A.Change the channel-group mode on SW2 to auto B.Change the channel-group mode on SW1 to desirable. C.Configure the interface port-channel 1 command on both switches. D.Change the channel-group mode on SW1 to active or passive.正确答案D