Refer to the exhibit.
A network administrator assumes a task to complete the connectivity between PC A and the File Server Switch A and Switch B have been partially configured with VLANs 10, 11, 12, and 13.
What is the next step in the configuration?
A.Add PDA to VLAN 10 and the File Server to VLAN 11 for VLAN segmentation B.Add VLAN 13 to the trunk links on Switch A and Switch B for VLAN propagation C.Add a router on a stick between Switch A and Switch B allowing for Inter VLAN routing D.Add PC A to the same subnet as the File Server allowing for intra-VLAN communication正确答案B